About Us
Who Are We

 

Who Are We

Steven R. Andrews, P.E., Project Manager
Mr. Andrews, is a Registered Civil Engineer and President of Steven Andrews Engineering and has 34 years of experience in the master planning, design and construction of wastewater systems and water systems for municipalities, water and sanitation districts.
  He has provided master planning and project management services for many Southern California water and wastewater agencies, such as the Orange County Water District, Irvine Ranch Water District, Moulton Niguel Water District, Trabuco Canyon Water District, East Valley Water District, Yucaipa Valley Water District, Yorba Linda Water District, Laguna Beach Water District, and the Cities of Chino, Chino Hills, Long Beach, Huntington Beach, Brawley, Corona and Placentia.  As a consultant, Mr. Andrews has been District Engineer for the El Toro Water District and the Trabuco Canyon Water District and is currently District Engineer for Tejon-Castac Water District, Marygold Mutual Water Company and Walnut Park Mutual Water Company.  View Resume


Carlos Ramirez, Senior Engineer
Mr. Ramirez is a SAE Senior Engineer with over 11 years of experience in the design of sewer systems, water systems, groundwater and soil remediation, and report preparation. Responsibilities as a Senior Engineer include master planning, design and construction management of booster pump stations, water storage reservoirs, sewage lift stations and water treatment plants.
View Resume



In addition, SAE can accommodate individual project staffing requirements by utilizing in-house expertise or building a project team of SAE consultants recognized in their field for outstanding project performance.  SAE uses a network of experienced professional consultants to provide engineering support in specialties such as structural, electrical, and instrumentation and control systems engineering.  This flexible staffing approach minimizes project costs and improves work efficiency. SAE's network of experienced principals ensures all projects are completed in a cost-effective, efficient and effective manner.